Limejump begins optimising Voltalia’s 32MW Hallen battery
Limejump has started optimising Voltalia’s first UK utility-scale battery, the 32MW Hallen battery in Bristol, today (3 August).
Limejump has started optimising Voltalia’s first UK utility-scale battery, the 32MW Hallen battery in Bristol, today (3 August).
Voltalia’s 32MW/32MWh Hallen battery energy storage system (BESS) has been commissioned, releasing first power into the grid in December.