Drax’s proposed bioenergy with carbon capture and storage (BECCS) plant could cost £31.7 billion in public subsidies according to a new report from Ember.
A new report produced by Baringa and commissioned by Drax has found bioenergy with carbon capture and storage (BECCS) could save the UK over £4.5 billion.
A pilot bioenergy with carbon capture and storage (BECCS) project is to take place in a partnership between Drax and Mistubishi Heavy Industries Engineering (MHI).