Ofgem is to reduce the overall connection charge for those connecting to the distribution network, having published its final decision on the Access and Forward-Looking Charges Significant Code Review (Access SCR).
A new report from Regen has detailed how changes to how electricity networks are paid for would have “far reaching” impacts – both positive and negative – on decarbonisation.
National Grid has confirmed that the expansion of Balancing Use of System (BSUoS) charges to include embedded generation is being considered by Ofgem, after Engie attempted to fast track the decision via a system operator workgroup.