Consumers based in Northern Ireland were able to avoid paying a collective total of £500 million thanks to the nation’s wind farms having provided 42% of electricity for the year.
Equinor is interested in developing a gigawatt scale floating offshore wind farm in the Celtic Sea in a bid to increase its renewable energy generation portfolio.
On 23 September, Chancellor Kwasi Kwarteng unveiled the UK Government’s prospective Growth plan aiming to reduce the cost of energy bills, at an expected cost of £31 billion over its first six months.
ScottishPower and BT will collaborate on increasing connectivity throughout windfarms and offices to increase bandwidth and reliability at green energy sites.
The Net Zero Technology Centre (NZTC), and the Cygnus JV and Sealand Projects has identified four electrification options for an offshore oil and gas asset to reduce emissions from its operation.
Octopus Energy Generation has announced that it is extending its Fan Club out into West Yorkshire, with the launch of its third local wind tariff in Halifax.