The Carbon Trust, along with Imperial College London and a cross-sector consortium have launched a new project looking at how a flexible energy system could help the UK reach net zero.
National Grid ESO's Grid Code modification request regarding disconnecting embedded generation is urgent, Ofgem has ruled, with a final decision expected before the end of the week.
The latest episode of the Solar Media Podcast is now available, with a considerable focus on how the global clean energy economy is fighting back against the COVID-19 pandemic.
Flexibility – and the actions required by government, Ofgem and National Grid ESO – formed a clear part of the National Infrastructure Commission’s (NIC) annual report.
Ofgem has said that “more thought” is needed on how demand-side response (DSR) units can incorporate limited duration technologies, such as storage, when bidding for Capacity Market contracts.
The latest T-1 Capacity Market (CM) auction has cleared at £1.00/kW/y, with just two storage assets winning contracts, prompting renewed questions over the benefits of running such auctions.